Activities :
1. Collection of Data - Waveform
๐ 19 November 2019
๐ฌ SPS 215, Level 2
๐ฌ SPS 215, Level 2
๐ For this project, there are two alarms that must be collecting the data of the sound waveform which are the NIBP sound alarm and battery failure sound alarm. The data of the battery failure sound alarm is collected by conducting 16 tests. Each test is observed by reading the frequency of the waveform for the full cycle and the positive width of the cycle. The serial monitor data calculated by the coding is also recorded. All of the data taken is captured using camera, the value of the reading is written in the Microsoft Excel to calculate the average value of the waveform's frequency, average value of the serial monitor's frequency, the difference between waveform's frequency and serial monitor's frequency and the percentage error of the differences between both value.
2. Updating FYP2 Thesis Report and Writing Technical Paper
๐ Due to all of the data has been collected, the thesis report of FYP2 and the technical paper can be continued to be finished. All the data in Chapter 4 : Results & Discussion has been changed with the new collection of data for both condition; battery failure and NIBP cuff failure. The results were recorded and tabulated using Microsoft Excel to observe the average value of the data and the percentage error between the oscilloscope's value and the serial monitor's value. After finished updating FYP2 thesis report from Chapter 1 until Chapter 5, the technical paper is written. The technical paper is the summarize of the full FYP2 thesis report.
"If I had eight hours to chop down a tree, I'd spend six hours sharpening my ax."
Abraham Lincoln
Post a Comment
<< home >>